![]() ![]() (a) Each local agency shall develop materials relating to the requirements of the federal Americans with Disabilities Act of 1990 (42 U.S.C. ![]() If the permits applied for are not issued in that 6-month time period, the permit application will expire, and the permit will need be re-applied under the 2022 codes adopted.įOR PERMITS REGARDING ALL PUBLIC ACCOMMODATIONS AND COMMERCIAL ENTITIES, PLEASE TAKE NOTE:ĬA. Applications that are submitted under the 2019 code cycle up until December 31st will need to have an issued permit within 6 months of the application date. The new 2022 California Building Code (CBC) and the new 2022 California Residential Code (CRC) is based on the 2021 International Building Code (IBC) and 2021 International Residential Code as amended by the California Building Code Commission.Īdditional new codes to be adopted are the 2022 California Administrative Code, 2022 California Mechanical Code (CMC), 2022 California Electrical Code (CEC), 2022 California Plumbing Code (CPC), 2022 California Energy Code, 2022 California Existing Building Code, 2022 California Historical Code, 2022 California Fire Code and 2022 California Green Code.Īll plan review applications submitted after Decemwill be required to comply with the new codes. If you are an Architect, Engineer, Designer or Contractor that performs work within the Elk Grove City limits, please be advised that new California Codes will take effect on January 1, 2023. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |